Bridleway Extra Long Lead Rope
Bridleway Extra Long Lead Rope
Extra Long Lead Rope Ideal for loading or leading. Comfortable in the hand, this Extra Long Read full description
Check in-store stock availability
Clonmel Shop | 3 Available* | Collect here |
Galway Shop | Available Online Only | Collect here |
Clonmel Shop | 5 Available* | Collect here |
Galway Shop | 5 Available* | Collect here |
Clonmel Shop | Available Online Only | Collect here |
Galway Shop | 11 Available* | Collect here |
Clonmel Shop | Available Online Only | Collect here |
Galway Shop | 7 Available* | Collect here |
Clonmel Shop | Select a size | |
Clonmel Shop | Item Currently Unavailable | Collect here |
Clonmel Shop | Item Currently Unavailable | |
Galway Shop | Select a size | |
Galway Shop | Item Currently Unavailable | Collect here |
Galway Shop | Item Currently Unavailable |
* Current availability, please contact store to reserve if making a special trip.
- Description
- Delivery & Returns
- Reviews
Extra Long Lead Rope
Ideal for loading or leading. Comfortable in the hand, this Extra Long Leadrope features a practical swivel trigger clip for easy fastening.
Shipping to Ireland has a standard carrier charge of €5.95. Spend €100 or more and get your goods delivered for FREE.
Estimated Delivery Date
An estimated delivery date for all products is displayed on the product page, basket and checkout.
Please note, that products in stock in our main dispatch warehouse will display the delivery message ‘Fast Home Delivery’ once a size has been selected and are available for dispatch within 24 hours.
Products in stock in a secondary warehouse location will display an estimated delivery date and are highlighted in amber.
For orders of multiple products, the dispatch date will take the longest product lead time and will be provided at checkout.
Returns
Returns policy of 30 days.
If you are not completely satisfied for any reason with the products you received, you have 30 days to return your item(s) from the date of delivery for a full refund.
Each item(s) you return needs to be new, unused, and in its original packaging. Please note that we do not cover the return shipping costs unless the return is a result of our error (you received an incorrect or defective item, etc.)
Please note, that we do not offer exchanges for online purchases.
To make your return quick and hassle-free please download and fill out this form and attach it to your return parcel, then use one of the methods below to send it back to us.
To Return Your Products (Ireland)
1. Go to https://www.anpost.com/Post-Parcels/Click-and-Post/Returns
2. Fill out the requested details
3. Pre-pay for your return
4. Drop-off at any AnPost location
Stock Alert
Please alert me via email when this product is back in stock.