Ireland Shipping Free On Orders Over €100

Largest Selection of Equestrian Products

Product Code: 1301IP

Bridleway Extra Long Lead Rope

9.00
Product Code: 1301IP

Bridleway Extra Long Lead Rope

9.00
Product Code: 1301IP

Extra Long Lead Rope   Ideal for loading or leading. Comfortable in the hand, this Extra Long Read full description

Select Your Colour:
Size (Size Guide)
Size (Size Guide)
Size (Size Guide)
Size (Size Guide)

Check in-store stock availability Icon

Check in-store stock availability

  • Description
  • Delivery & Returns
  • Reviews
Description

Extra Long Lead Rope

 

Ideal for loading or leading. Comfortable in the hand, this Extra Long Leadrope features a practical swivel trigger clip for easy fastening.

Delivery & Returns

Shipping to Ireland has a standard carrier charge of €5.95. Spend €100 or more and get your goods delivered for FREE.

Estimated Delivery Date

An estimated delivery date for all products is displayed on the product page, basket and checkout. 

Please note, that products in stock in our main dispatch warehouse will display the delivery message ‘Fast Home Delivery’ once a size has been selected and are available for dispatch within 24 hours.

Products in stock in a secondary warehouse location will display an estimated delivery date and are highlighted in amber.

For orders of multiple products, the dispatch date will take the longest product lead time and will be provided at checkout. 

Returns

Returns policy of 30 days.

If you are not completely satisfied for any reason with the products you received, you have 30 days to return your item(s) from the date of delivery for a full refund.

Each item(s) you return needs to be new, unused, and in its original packaging. Please note that we do not cover the return shipping costs unless the return is a result of our error (you received an incorrect or defective item, etc.)

Please note, that we do not offer exchanges for online purchases.

To make your return quick and hassle-free please download and fill out this form and attach it to your return parcel, then use one of the methods below to send it back to us.

 

To Return Your Products (Ireland)

    1. Go to https://www.anpost.com/Post-Parcels/Click-and-Post/Returns
    2. Fill out the requested details
    3. Pre-pay for your return
    4. Drop-off at any AnPost location

 

Reviews

Stock Alert

Please alert me via email when this product is back in stock.

Fast Efficient international shipping

Simply select the country you would like to deliver to and the currency you would like to shop in.

Back to top